PROMO: is here
Antex installs precast steps for Toronto and GTA entrances. We measure the rise, landing, door clearance, base and delivery access on site before pricing. Your itemized estimate separates materials and labour, because a phone quote cannot show what removal, placement or site access will require.
Built on trust and quality.
Trusted by Toronto Homeowners & Builders Since 2010






The rise, run, landing and door swing decide what will fit. We take those measurements before selecting a unit, so the entrance is not treated as a generic opening.
Precast concrete steps need support that stays level. We check the visible condition of the existing base and water flow, because Toronto freeze-thaw cycles can worsen a weak or wet support.
Exterior installations can continue in winter when weather and the job type allow. Material availability and site conditions affect timing, so you receive an approximate installation date and a call if it moves.






Point At the Concrete Steps You Want
Most homeowners know the look they want before they know the construction terms for it. Choose the options that fit your home and how you use the steps. Antex measures on site, then brings your choices to an itemized price for the work.
We measure the entrance and review the visible base condition and drainage on site. If the support needs work, that conversation happens before a unit is ordered.
Laser measurements cover the stair rise, run, landing and door clearance. We also confirm the applicable Ontario Building Code requirement on site for the entrance and handrail layout.
Materials and labour are split out in an itemized written estimate held for two weeks. The price changes only if you change the scope or materials, with no hidden charges.
The site visit includes the route from delivery point to entrance. We identify access limits before arranging the work, rather than assuming equipment can reach a tight lot.
We review where surface water goes around the porch and steps. That helps avoid placing new work over a condition that keeps sending meltwater toward the house.
If the support has settled or water collects around it, the steps can shift after winter. Replacing only the visible concrete can leave the original cause below.
A wrong rise, landing depth or door clearance makes daily use awkward. It can also leave no practical place for a handrail where one is needed.
Removal, disposal, delivery and equipment can be left out of a quick number. Those omissions make it hard to compare one quote with another.
A narrow side yard, parked cars or a tight front approach can change how a precast unit reaches the entrance. Finding that out on installation day causes delay.
Snowmelt and rain can pool at the bottom step or near the porch. Repeated freezing and thawing can make cracks and separation worse.
The right shape depends on the height from grade to landing, the width of the approach and the room available at the door. Precast concrete stairs suit many front entrances, but we confirm the visible support, access and applicable requirements on site. Toronto snowmelt and road salt make drainage and a clear walking surface worth discussing before selection.
A compact unit for a low front entrance or porch. It suits homes where the landing and approach are already clearly defined.
Several formed treads in one unit for a taller entrance. It suits a porch height that needs a consistent route from walkway to landing.
Steps paired with a metal handrail where the entrance layout calls for one. Antex fabricates metal railing structures in its own shop.
A step project that also needs the landing reviewed. It suits an entrance where the old concrete and surrounding approach have aged together.
We measure on site by laser because the landing, door clearance, support and access decide the work. A phone number cannot account for those conditions.
Supplied materials are ordered only after you accept the itemized scope. Lead time depends on material availability, and your dedicated contact calls if the approximate date moves.
We protect planting, keep dust down and cart away waste. Your project manager does the final check with you before the last 10% payment.
These completed step configurations show how finish, colour, reinforcement and edge treatment come together at exterior entrances. Each selection reflects a practical response to Toronto's wet winters, snow clearing and everyday foot traffic at front porches and walkways.
A textured approach created a defined walking surface between the front walk and porch.
A clean landing and step profile completed a compact entrance transition beside an existing porch.
Toronto homeowners describe a clear process, careful site work and dependable handovers.
Wonderful experience. Antex team installed our glass shower enclosure and it looks great. Service was fast without sacrificing quality.
Anyone can hang a panel of glass. Antex is different in four ways that show up on your invoice, your calendar, and your final inspection.
We laser-measure the actual rise, landing, door clearance and access route before pricing, because each one affects the unit and installation plan.
The written estimate separates materials and labour and stays valid for two weeks. It moves only when the scope or materials change.
A dedicated point of contact stays with the project from first visit to final walkthrough. You receive a progress update at the end of each working day.
The Construction Agreement includes a written workmanship warranty on installation labour. Manufacturer warranties on supplied materials are passed through.
You should know what is being measured, what is included and when the work is expected to happen. The process keeps the base, access and delivery questions in view before installation day, with one contact to update you as the project moves.
We visit the property to laser-measure the entrance and review visible support, drainage, door clearance and access. Within one to two business days, you receive an itemized estimate for materials and labour, valid for two weeks. No material is ordered until you approve it.
After approval, we arrange the precast unit and coordinate the installation plan. You receive an approximate installation date and a written timeline where one applies. Material availability and weather can affect exterior work, and we call when a date changes.
We cover planting, keep dust down and remove waste within the agreed scope. The project manager checks the installation, then completes a final walkthrough with you. The remaining 10% is paid after that walkthrough, not before.
If your old concrete is cracked, flaking or settling, have the entrance checked before choosing a unit. Antex serves Toronto and the GTA with free on-site estimates for qualifying projects. We measure the rise, landing, base and access, then send an itemized estimate within one to two business days. There is nothing to sign during the visit.